It has come to our attention that certain coaching centers are misusing names similar to ours, such as Vajirao or Bajirao, in an attempt to mislead and attract students/parents. Please be informed that we have no association with these fake institutes and legal proceedings have already been initiated against them before the Hon'ble Delhi High Court. We urge students and parents to stay vigilant and let us know in case they are approached by such fake institutes.

Which Projects Need EC, CRZ, or Forest Clearance in India?

13/11/2025

Key Highlights

  • Environmental Clearance Frameworks
  • Various project Categories
  • Clearance Procedures
  • Public Participation
  • Challenges in implementation

According to the Environmental Impact Assessment (2006) Notification, any development that alters land use or impacts negatively on air, water, or the quality of the ecosystem, a developer to obtain prior Environmental Clearance (EC). The need is applied to industrial, infrastructural, and real estate developments. In addition, any development that is located in the Coastal Regulation Zones (CRZ) must acquire CRZ clearance, but diversion of forest land requires Forest Clearance. The article “Which Projects Need EC, CRZ, or Forest Clearance in India?” highlights the regulatory gaps and environmental weaknesses in place, thus highlighting the case of Pallikaranai marshland as a relevant case in point.

which-projects

Tips for Aspirants
To individuals that intend to take the UPSC Civil Services Examination as well as the State Public Service Commission examination, the current article is invaluable as it is a systematic approach to the issues of environmental governance, legal frameworks, and clearance processes, areas of paramount significance in the General Studies III (Environment) syllabus, as well as being equally relevant in the areas of essay writing and interview preparation.

Relevant Suggestions for UPSC and State PCS Exam

  • Legal Foundation: Environmental Clearance (EC) is required in the Environment (Protection) Act, 1986, and the EIA notification, 2006. 
  • Types of projects: Projects under the Environmental Clearance (EC) are mandated in cases of industrial projects, infrastructure projects, mining projects, and waste-management projects that have a substantial impact on land, air, water, or ecology.
  • CRZ Clearance: The Coastal Regulation Zone Notification, 2011, categorizes the zones and limits activities in the coastal projects. 
  • Forest Clearance: Forest land diversion projects must be approved by the Forest (conservation) act of 1980, accompanied by compensatory afforestation plans. 
  • Clearance Process: This is through screening, scoping, public consultation, and expert evaluation through Environment Assessment Committees (EACs) or State EIA Authorities (SEIAAs). 
  • Public Participation: Public hearings are compulsory, though often hampered by a lack of accessibility as well as poor representation of impacted parties.
  • Challenges: The extended screening, poor after-clearance, follow-up and watering down of regulatory standards all contribute to the poor environmental care.
  • Reforms Needed: Sustainable development requires the increase of institutional capacity, the use of more transparency, and the strict use of scientific methods.

Environmental governance in India compels that projects which may have a serious impact on the land management, ecosystem, or natural resources be pre-cleared. In compliance with the Environment Impact Assessment (EIA) Notification of 2006, which came into effect in the state of the Environment (Protection) Act of 1986, any proposed undertaking will be subject to environmental repercussions; however, it must obtain Environmental Clearance (EC) before commencing the said undertaking. The legislative tool aims at sustaining a healthy environment by considering cumulative as well as site-specific effects caused by industrial, infrastructural, and development projects, among others. In addition to the EC, projects located in the ecologically sensitive environment, especially shoreline and forestlands, must seek clearance in the Coastal Regulation Zone (CRZ) and Forest under the separate legislations, respectively. These clearances are not only part of formalities in the procedure to attain but also used as tools of necessity to balance development goals and ecological sustainability. The clearance process has a number of steps: screening, scoping, public consultation, and expert appraisal, thus combining scientific review with participatory governance.

Projects in India Requiring EC, CRZ, and Forest Clearance

The Article questions the categorization of the projects that require such clearances, the legal framework and institutional framework that follow them, and the challenges that follow the implementation and compliance. It elucidates the extent and value of EC, CRZ, and Forest Clearances, hence this develops a better understanding of the environmental regulation landscape in India and the role it plays in ensuring development that is responsible.Projects like large-scale housing developments, industrial estates, mines, power plants, and major infrastructure (ports, airports, highways) require Environmental Clearance (EC). Coastal Regulation Zone (CRZ) clearance is needed for projects within 500 meters of the High Tide Line, such as resorts, ports, and roads near the coast. Forest Clearance (FC) is required for any project

Legal Framework and Purpose

The environmental regime in India is established on the basis of statutory and procedural safeguards that are aimed at regulating the projects that have a potential environmental impact. Such clearances have the effect of pre-empting checks to ensure sustainable development.Environmental clearance guidelines require a project to undergo a multi-stage process, including online application submission, screening, scoping, public consultation, and appraisal by expert committees before a final decision is made.A legal framework is a set of laws, regulations, and guidelines that establish rules for a specific area, while its purpose is to provide clarity, structure, and a foundation for achieving a particular goal.

Legal grounds of Environmental Approval
The legislative base of the environmental governance of India is the Environment (Protection) Act, 1986. In accordance with this Act, the Environment Impact Assessment (EIA) Notification was promulgated by the Ministry of Environment, Forest and Climate Change (MoEFCC) in 2006 and places a compulsion on projects that are likely to change the land use or those that affect air, water, and biodiversity to seek a prior Environmental Clearance (EC). The notification has placed projects into two categories, which are Category A (central appraisal) and Category B (state-level appraisal), based on the scale and the potential impact. Such a law system ensures that environmental factors are considered during the planning of a project.

legal-mandate

Sea-Coast and Forest Regulating Instruments
Projects that fall within sensitive ecological mechanisms of the coastal zone must be in line with the Coastal Regulation Zone (CRZ) Notification, 2011, which places limitations on undertaking operations within prescribed coastal areas. Similarly, the Forest (Conservation) Act, 1980 controls the use of forest land for other purposes that are not forest-related; this law requires Forest Clearance by the central government. These instruments aim at protecting delicate ecosystems against unsustainable exploitation and to take security measures, such as the inclusion of compensatory afforestation and biodiversity protection measures.

Intention and Limitation of Clearances
Environmental, coastal, and forest clearances are aimed mainly to prevent irreversible destruction of the ecosystem and enable the making of informed decisions. The clearances are not just procedural barriers but are also used as tools in the assessment of environmental risks, accountability of the people, and inter-agency coordination. They also make the proponents of the projects reveal the environmental effects, come up with mitigation measures, and consult with the affected communities during the processes. This will lead to transparency and hence development that is in line with ecological stewardship.

Mechanisms in the institutions and compliance issues
Expert Appraisal Committees (EACs) and State Environmental Impact Assessment Authorities (SEIAA): these are bodies that oversee the clearance and evaluate the project proposals with respect to the available scientific and socio-environmental standards. However, there are still problems to address, including delays during the procedure, inadequate initial data, and limited post-clearance surveillance capabilities. Moreover, the cases of non-observance and weakening of the norms have raised questions about the effectiveness of the clearance regime in safeguarding the physical interests of the environment.

Case Study:
Pallikaranai Marshland - A Lesson in Mismanagement of the Ecosystem

One of the last surviving natural wetlands in a metropolitan area is the Pallikaranai marshland in Chennai, Tamil Nadu, which has been designated as an ecologically sensitive area. Although the marshland is a designated region under the supervision of the Tamil Nadu Forest Department and it is featured in the National Wetland Atlas, it has significantly suffered ecological damage due to unregulated urban encroachment and a lack of organization in the administration.

A total of less than 700 hectares has been reduced to the initial 6,000 hectares due to the unlawful intrusion, random dumping of solid waste, and a series of infrastructural developments. Specifically, the construction of roads, sewerage facilities, and residential complexes was done against the requisite Environmental Clearance (EC), hence breaking the Environment (Protection) Act, 1986, and the Environmental Impact Assessment (EIA) Notification, 2006. Lack of stringent Environmental Impact Assessment and reliable Coastal Regulations Zone (CRZ) and Forest Approval has catalysed the loss of habitat, pollution of groundwater water and increased the risk of urban flood hazard.

The case is used as a paradigmatic example of the consequences of the avoidance of the protocols of statutory clearance and emphasizes the necessity of strict compliance with the environmental legislation. It also points out the importance of the involvement of the connecting people and the adjudication in court in protecting ecological resources. The National Green Tribunal (NGT) and other civil society groups have helped spearhead restoration efforts and hold people responsible.

To the aspirants in the Union Public Service Commission (UPSC) and the State Public Service Commissions (PCS), the Pallikaranai case provides key information about environmental regulation, legal standards, and the potential relationship between urban planning and ecological sustainability- key concepts in the General Studies Paper III and ethical case study examination.

Projects that need environmental clearance

The EIA Notification of 2006, which exists as Environmental Key, is pertinent where the project poses severe risks to the land-use, air and water quality, or ecological matters. Such undertakings cut across various sectors. Projects requiring environmental clearance include those in mining, infrastructure (like highways, airports, and ports), power plants, and large industrial and real estate developments.

Industrial and Manufacturing Projects
One of the major activities that require EC is the large-scale industrial ones that may cause great pollution and consumption of resources. These are thermal power plants, cement factories, oil refineries, chemical manufacturing units, and metallurgical industries. These projects are often associated with risky activities, extensive use of energy, and pollution that should be examined in terms of environmental safety. The appraisal of Category A projects, including coal-based power plants ≥500MW, is done at the central level, and that of the Category B projects having less than 500 MW is done by the State Environmental Impact Assessment Authorities (SEIAAs).

The Urban Development and Infrastructure
The infrastructure projects significantly alter the land use and often overlap with ecologically sensitive areas. Highways, expressways, airports, ports, and railway lines need EC due to their size and their ability to divide habitats. Other types of urban expansion projects that include townships, Special Economic Zones (SEZs), and industrial estates do not leave out this category either. Such developments may initiate cutting down, depletion, and vehicular emissions of the environment, thus necessitating environmental appraisal and mitigation planning.

Activities in Mining and Extraction
The EC applies to mining activities, be it coal, iron ore, bauxite, or limestone, as they directly affect land life and waterways, and water bodies, as well as biodiversity. More specifically, open-cast mining triggers soil erosion, dust pollution, and population relocation. The EIA Notification requires elaborate environmental impact studies and rehabilitation plans for such projects. In addition, the exploration and offshore drilling of oil and gas must be cleared out of the way due to the hazards of marine pollution and seismic disturbances.

Waste Management and Hazardous Facilities
Waste treatment, biomedical waste storage, and storage of hazardous chemicals require EC due to the fact that they have the effect of contaminating air, water, and soil. Those who are in this category are incinerators, landfills, and recycling plants. The clearance procedure takes into account that these facilities meet the safety standards, pollution regulation standards, and the protection of the health of the population.

Requirements on Coastal and Forest Clearance

Projects involving forest land require prior approval under the Forest (Conservation) Act, 1980. Any diversion of land recorded as forest whether reserve forest, protected forest, or deemed forest. The ecologically vulnerable areas, like coastal areas and forest belts, are prone to different regulatory clearances in India. The purpose of these mechanisms is to stop the destruction of delicate ecosystems, wrecking them irreparably.

Coastal Regulation Zone (CRZ)
The activities along the Indian coasts, which have a length of about 7500km, are regulated by the Coastal Regulation Zone (CRZ) Notification of 2011, as per the Environment (Protection) Act, 1986. It categorizes coastal zones into four zones (CRZ-I to CRZ-IV) based on the ecological sensitivity and development capacity. The projects (ports, tourism infrastructure, housing, and industrial facilities) within these zones must obtain clearance of CRZ by the Ministry of Environment Forest and Climate Change (MoEFCC) or the concerned State Coastal Zone Management Authorities. The clearance procedure requires the following documents to be presented: a Coastal Zone Management Plan (CZMP), an environmental impact assessment, and consultation with the people. They are meant to manage land use, curb erosion, and save the coastal biodiversity, mangroves, and the estuaries.

Forest Clearance under the Forest (Conservation) Act, 1980
The clearance of the forest is necessary in every project where the diversion of forest land to other non-forest use is involved, e.g., road construction, dams, mines, or transmission lines. Under the Forest (Conservation) Act of 1980, the procedure has two steps: an In-Principle Clearance, followed by a Final Clearance by the central government. Using the PARIVASH portal, proponents have to present detailed plans. The Forest Advisory Committee (FAC) then undertakes a careful evaluation of ecological impact, density of the forests, as well as biodiversity value, before the granting of clearance. This process makes sure that forest land is not distorted without proper protection and ecological integrity.

coastal-forest-zones

Combined Better Clearance Challenges
In the overlapping sensitive areas like the coastal forests or mangrove belts, the projects must include both CRZ and Forest clearances. The variety of approvals may cause a delay in the procedure and inter-agency coordination difficulties. In addition to this, the issue of weakening norms, insufficient public engagement, and post-clearance adherence has been raised.

Process, Problems, and Civic Engagement

Civic engagement is the process of people taking collective action on public issues, often hindered by problems like a lack of trust or underrepresentation.The framework needed to facilitate environmental clearance in India has been developed with a view to evaluating the impact of the potential projects on the environment before they are set up. It intertwines scientific evaluation, regulatory oversight, as well as stakeholder participation and the aim of sustainable development.

Environmental Clearance Process Stages
The clearance process under the Environmental Impact Assessment Notification of 2006 is structured into a series of steps, namely screening, scoping, public consultation, and appraisal. The screening identifies obligations of environmental clearance to a project based on its classification and magnitude. Scoping involves the preparation of Terms of Reference (ToR) to be used to direct the study on Environmental Impact Assessment. Public consultation includes a mandatory hearing that aims to retrieve the feedback of the impacted constituencies. In the end, the EIA report is examined by the Expert Appraisal Committee (EAC) or the State Environmental Impact Assessment Authority (SEIAA), and a decision on clearance is taken. This is a stratified scheme that ensures that environmental risks are identified and uncovered before endorsing the project.

governance-challenges

Difficulties in Implementation and Compliance
Despite the formal structure of the framework, the system of clearance faces various challenges in implementation.

  • Lateness in appraisal, a lack of enough baseline data to appraise, and limited technical skills in the regulatory agencies have the propensity to reduce the quality of the environmental assessment.
  • Additionally, post-clearing surveillance is not effective, and hence, a large proportion of non-adherence to the prescribed conditions.
  • The failure to integrate seamlessly between the environmental clearances (EC), Conservation Reserve Zone (CRZ), and Forest Clearance regimes is an added obstacle to project schedules and accountability as well.
  • Other critics have also cautioned that the normative protection has been compromised by legislative amendments that have diminished the power of the people to scrutinize and speed up the process of approval.

Role and Limitation of Public Participation
The engagement of the public is one of the pillars of environmental governance, which aims to democratize the decision-making process and enhance transparency. The public-hearing aspect gives the communities a platform where they can express concerns about ecological and socio-economic consequences. However, the effectiveness of this instrument is often undermined by the lack of procedural efficiency, e.g., lack of notice, non-transparent documentation, and poor representation. In some cases, the community input is not taken into consideration at all or is not given sufficient weight in making final decisions. Participatory augmentation and informed consent become the key requirements of obtaining equitable and ecologically sound results.

Strengthening Environmental Governance
Reforms that raise the clearance regime include raising institutional capacity, instilling methodological rigor in the undertaking of an EIA effort, and strengthening post-cleansing responsibility. Digital interfaces, including PARIVESH, have certainly positively enhanced transparency, but they should be provided with more data integration, real-time monitoring, and extensive mechanisms of grievance-redressal. A robust clearance provision was instituted that protects ecological systems and, at the same time, builds trust among people in environmental regulation.

Conclusion

In summary, the legal framework of the Indian environmental, coastal, and forest clearances has a very important nexus between environmental conservation as opposed to developmental planning. Environment Impact Assessment (EIA) Notification, 2006, alongside the industry-specific legislation [e.g., Forest (Conservation) Act and the Coastal Regulation Zone (CRZ) Notification], establishes procedural protections that are set to alleviate negative environmental effects. Despite the fact that the clearance process fosters transparency and participatory governance features, there are still consistent issues of its implementation, compliance, and inter-agency coordination that require systemic reforms. A lack of institutional capacity, civic engagement, and scientific enquiry requires immediate response to harmonize the growth of infrastructural development with saving the environment and changing the legal role of India, as the country is shifting to a new developmental model.